Search plants, projects, owners, and states
170 MW Batteries (50 MW) + Solar Photovoltaic (120 MW) operating in Otero, NM
170 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
32.0770, -106.2864
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Otero, NM
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 41.764 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Buena Vista Energy Center, LLC | NextEra Energy Inc | — |
| Owner(s) | Buena Vista Energy Center, LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Buena Vista Energy Center is a 170 MW hybrid power plant located in Otero County, New Mexico. The facility, which began operating in 2023, combines solar photovoltaic generation with battery energy storage. It is owned by NextEra Energy and operated by Buena Vista Energy Center, LLC. The plant utilizes single-axis tracking for its solar panels and has a battery energy storage system (BESS) with a capacity of 200 MWh and a duration of 4 hours, employing lithium-ion battery chemistry (LIB). Buena Vista Energy Center is interconnected within the El Paso Electric Company balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
The plant consists of two generators and primarily uses electricity as its fuel source, indicating the hybrid nature of the facility. In its most recent year of operation, the plant generated 387,717 MWh, achieving a capacity factor of 26.0%. Financial data indicates a power purchase agreement (PPA) price of $5.46 per MWh. Buena Vista Energy Center is ranked as the 11th largest power plant out of 15 in New Mexico and 355th out of 514 nationally.
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
El Paso Electric Company (EPE)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
22.8K MWh
Latest Month
387.7K MWh
Annual Generation
26.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Buena Vista Energy Center, LLC · Data from 2023–2025
$5.5/MWh
PPA Price
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
1 buyer • 24 active contracts
Last updated 2026-05-31
View all 5 articlesBattery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
A specific company (e.g., NextEra Energy, Duke Energy)
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
NextEra Energy
Data-driven briefing on NextEra Energy — fleet, generation, financial, and news signals.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.