Search plants, projects, owners, and states
112 MW Batteries (32 MW) + Solar Photovoltaic (80 MW) planned in Duplin, NC
112 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
35.1453, -78.1596
County
Duplin, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Owner(s) | Cypress Creek Renewables | Cypress Creek Renewables | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Cypress Creek Renewables
This entity is not yet in the GEM ownership database — chain unavailable.
Panther Branch Solar, LLC, located in Duplin County, North Carolina, is a 112 MW hybrid power plant utilizing both solar photovoltaic and battery storage technologies. The plant, identified by plant ID 66385, is operated by Cypress Creek Renewables. It consists of two generators and uses fixed-tilt solar tracking. The primary fuel type is reported as MWH, indicating the plant's reliance on solar energy converted to megawatt-hours.
Panther Branch Solar operates within the Duke Energy Carolinas balancing authority and is part of the SERC NERC region. As a solar facility, its output contributes to the renewable energy mix within North Carolina. The plant's capacity ranks it as the 3rd largest of 5 solar plants in the state and 457th largest of 514 solar plants nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Carolinas (DUK)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $172.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Panther Branch Solar, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo