Search plants, projects, owners, and states
3 MW Solar operating in Yamhill, OR
3 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
45.1029, -123.4127
County
Yamhill, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SolRiver Capital LLC | SolRiver Capital | — |
| Owner(s) | SolRiver Capital LLC | — | — |
| Status | Operating | operating | — |
Sheridan Solar LLC (CSG) is a 3 MW solar photovoltaic power plant located in Yamhill County, Oregon. The plant began operating in 2024 and has a single generator. SolRiver Capital LLC is the plant's operator. The facility utilizes single-axis tracking to maximize solar energy capture. It is interconnected to the grid within the Portland General Electric Company balancing authority, operating within the Western Electricity Coordinating Council (WECC) NERC region.
In its most recent year of operation, Sheridan Solar generated 6,288 MWh of electricity, achieving a capacity factor of 23.8%. The plant is ranked as the 61st largest solar facility in Oregon out of 147, and it holds a national ranking of 4029 out of 7108 similar facilities. The plant's primary fuel source is solar energy.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Portland General Electric Company (PGE)
Grid Voltage
13.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
126 MWh
Latest Month
6.3K MWh
Annual Generation
23.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $4.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Sheridan Solar LLC (CSG)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo