Search plants, projects, owners, and states
5.8 MW Solar operating in Crow Wing, MN
5.8 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
46.3910, -94.1405
County
Crow Wing, MN
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Onsite Partners, LLC | AEP OnSite Partners | — |
| Owner(s) | AEP Onsite Partners, LLC | — | — |
| Status | Operating | operating | — |
The Brainerd Airport solar photovoltaic plant is located in Crow Wing County, Minnesota. The facility has a total capacity of 5.8 MW and commenced operations in 2022. It is owned and operated by AEP Onsite Partners, LLC. The plant utilizes a single-axis tracking system for its solar panels and consists of one generator.
In its most recent year of operation, the Brainerd Airport plant generated 9,958 MWh of electricity, resulting in a capacity factor of 19.5%. The plant operates within the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and the NERC MRO region. According to available data, the Brainerd Airport plant ranks 24th out of 540 solar facilities in Minnesota and 2149th nationally out of 7108 plants. Financial data indicates the plant is included in the LBNL solar dataset.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
171 MWh
Latest Month
10.0K MWh
Annual Generation
19.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2022–2024
$31.1/MWh
Energy Value
$2.9/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MINN.HUB
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Brainerd AirportForward forecasts, scenario decomposition, and risk-decision tooling for this asset.