643.4 MW Wind operating in Republic, KS
643.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2023
Operating Since
Coordinates
39.8160, -97.4310
County
Republic, KS
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | High Banks Wind, LLC | NextEra Energy Inc | — |
| Owner(s) | High Banks Wind, LLC | NextEra Energy | — |
| Status | Operating | operating | — |
High Banks Wind is a wind power plant located in Republic County, Kansas. The facility, owned by NextEra Energy and operated by High Banks Wind, LLC, has a total capacity of 643.4 MW. Commissioned in 2023, the plant utilizes a single generator consisting of multiple onshore wind turbines. The turbines have a hub height of 114 meters and a rotor diameter of 127 meters, and were manufactured by GE Wind, model GE2.8-127.
In its most recent year of operation, High Banks Wind generated 2,519,732 MWh of electricity, achieving a capacity factor of 44.7%. The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. High Banks Wind is the largest wind farm in Kansas out of 44, and the 13th largest in the United States out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
225.6K MWh
Latest Month
2.5M MWh
Annual Generation
44.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,758/kW
Est. Construction Cost
Total estimated cost: $1.1B
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
High Banks Wind Substation · 345 kV
Substation Distance
0.01 km
Operator
NextEra Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
WR.HBWA.HBWA
Pricing Hub
SPP North Hub
Location Type
Settlement Location
Node Source
Curated node match
Last updated 2026-03-26