Search plants, projects, owners, and states
20 MW Solar operating in Lenawee, MI
20 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
41.9190, -83.9960
County
Lenawee, MI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Blue Elk I Solar, LLC | Torch Clean Energy | — |
| Owner(s) | Blue Elk I Solar, LLC | Torch Clean Energy | — |
| Status | Operating | operating | — |
GEM identifies the owner as Torch Clean Energy
This entity is not yet in the GEM ownership database — chain unavailable.
Blue Elk I Solar, LLC is a 20 MW solar photovoltaic power plant located in Lenawee County, Michigan. The plant, owned and operated by Blue Elk I Solar, LLC, utilizes a single generator and fixed-tilt solar tracking technology. It is interconnected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and falls within the ReliabilityFirst Corporation (RFC) NERC region.
Blue Elk I Solar ranks as the 36th largest solar plant in Michigan out of 84 facilities, and it holds the 1418th position nationally among 7108 solar plants. The plant's primary fuel source is the sun.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
46.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $32.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Adrian Energy Associates Llc
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
MICHIGAN.HUB
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Blue Elk I Solar, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo