Search plants, projects, owners, and states
No longer in EIA's lists of operating or planned plants. Last listed in January 2026. EIA-860M · Sep 2026
1 MW Solar in Dodge, MN
1 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
44.0406, -92.6926
County
Dodge, MN
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | SunShare Management | SunShare Management | — |
| Owner(s) | SunShare Management | — | — |
| Status | No longer listed | operating | — |
Quarry Sun CSG is a 1 MW solar photovoltaic power plant located in Dodge County, Minnesota. The plant began operating in 2025 and is owned and operated by SunShare Management. It consists of a single generator utilizing fixed-tilt solar tracking technology.
The plant's location places it within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the Midwest Reliability Organization (MRO) NERC region. Quarry Sun CSG ranks as the 445th largest power plant in Minnesota out of 540, and nationally it is ranked 6918 out of 7108 plants. The plant's primary fuel source is the sun.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
—
Balancing Authority
—
Grid Voltage
—
Regulatory Status
—
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,606/kW
Est. Construction Cost
Total estimated cost: $1.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Byron Substation · 345 kV
Substation Distance
3.486 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
NSP.CMMPA.KASS
Pricing Hub
MINN.HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Quarry Sun CSGForward forecasts, scenario decomposition, and risk-decision tooling for this asset.