1.5 MW Solar operating in Mitchell, IA
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
43.2795, -92.7913
County
Mitchell, IA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Altus Power America Management, LLC | Greenbacker Renewable Energy | — |
| Owner(s) | Greenbacker Renewable Energy Corporation | — | — |
| Status | Operating | operating | — |
Maple City is a 1.5 MW solar photovoltaic power plant located in Mitchell County, Iowa. The plant began operating in 2022 and has a single generator. It is owned and operated by Greenbacker Renewable Energy Corporation. The plant's primary fuel source is solar energy.
In its most recent year of operation, Maple City generated 3,079 MWh of electricity, achieving a capacity factor of 23.4%. The plant utilizes a fixed tilt solar tracking system. Maple City is connected to the Associated Electric Cooperative, Inc. balancing authority and operates within the Midcontinent Reliability Organization (MRO) NERC region. The plant is ranked as the 23rd largest solar facility in Iowa out of 31, and ranks 5837th nationally out of 7108 plants.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Associated Electric Cooperative, Inc. (AECI)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
78 MWh
Latest Month
3.1K MWh
Annual Generation
23.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2022
$1,784/kW
Est. Construction Cost
Total estimated cost: $2.7M
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Maple City