Search plants, projects, owners, and states
185 MW BESS operating in Honolulu, HI
Outside CONUS — spatial-market dimensions not provided by this dataset.
185 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2023
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
21.3283, -158.1052
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Honolulu, HI
Nearby Plants
An endpoint uses a short spatial match; the actual terminal connection remains unconfirmed.
1 mapped line section connects the two facilities over 0.712 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Kapolei Energy Storage I, LLC | — | — |
| Owner(s) | Kapolei Energy Storage I, LLC | — | — |
| Status | Operating | — | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Kapolei Energy Storage is a battery energy storage system (BESS) located in Honolulu County, Hawaii. The plant, which began operating in 2023, has a total capacity of 185 MW and is operated by Kapolei Energy Storage I, LLC. It is the largest of three battery storage plants in Hawaii, and ranks 338th nationally out of 514 such facilities.
The facility consists of a single generator utilizing lithium-ion battery (LIB) chemistry. The BESS has a total storage capacity of 565 MWh, providing a duration of approximately 3.05 hours at full output. The plant operates within the balancing authority of Hawaiian Electric Co Inc. The plant's primary fuel is listed as 'MWH', indicating that it draws power from the grid to charge its batteries.
Grid Region
Hawaii
Market
Bilateral Market
NERC Region
—
Balancing Authority
Hawaiian Electric Co Inc (HECO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−1.4K MWh
Net Charging
-18.7K MWh
Annual Net Energy
-1.2%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $251.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 6 articlesBattery Storage queue pipeline by status
Data tables and metrics from the InfraSure database.
Battery storage queue pipeline
Summary analysis with parallel narrative sections and visualizations.
Battery Storage queue pipeline overview
Summary analysis with parallel narrative sections and visualizations.
Kapolei Energy Storage
Data-driven briefing on Kapolei Energy Storage — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.