101.2 MW Wind operating in Steuben, NY
101.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2023
Operating Since
Coordinates
42.1016, -77.7011
County
Steuben, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Eight Point Wind, LLC | NextEra Energy | — |
| Owner(s) | Eight Point Wind, LLC | NextEra Energy | — |
| Status | Operating | operating | — |
Eight Point Wind is a 101.2 MW wind power plant located in Steuben County, New York. The plant began operating in 2023 and is owned by NextEra Energy, with Eight Point Wind, LLC as the listed operator per the EIA. The facility consists of a single generator utilizing onshore wind turbine technology. It ranks 20th out of 22 wind plants in New York state and 696th nationally out of 734.
The plant uses GE Wind GE5.5-158 turbines, with a rotor diameter of 158 meters and a hub height of 117 meters. In its most recent year of operation, Eight Point Wind generated 267,393 MWh of electricity, achieving a capacity factor of 30.2%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
115.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
31.7K MWh
Latest Month
267.4K MWh
Annual Generation
30.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$2,114/kW
Est. Construction Cost
Total estimated cost: $213.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
NYISO
LMP Node
EIGHT_POINT___WT_PWR
Pricing Hub
NYISO Zone B
Location Type
Generator
Node Source
Curated node match
Last updated 2026-03-26