Search plants, projects, owners, and states
4.6 MW Natural Gas operating in Worcester, MA
4.6 MW
Nameplate Capacity
1
Generators
unit
Natural Gas Fired Combustion Turbine
Technology
2022
Operating Since
Coordinates
39.0064, -120.7465
County
Worcester, MA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Norton Powerhouse 2 | — | — |
| Owner(s) | Norton Powerhouse 2 | — | — |
| Status | Operating | — | — |
Norton Powerhouse 2 is a 4.6 MW natural gas-fired combustion turbine power plant located in Worcester County, Massachusetts. The plant began operating in 2022 and has one generator. It is owned and operated by Norton Powerhouse 2. The plant is connected to the ISO New England Inc. balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
In its most recent year of operation, Norton Powerhouse 2 generated 28,601 MWh of electricity, achieving a capacity factor of 68.8%. The plant ranks 28th out of 37 power plants in Massachusetts based on capacity, and 1606th out of 1963 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Industrial
Sector
Industrial CHP
2.5K MWh
Latest Month
28.6K MWh
Annual Generation
68.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1202 lb/MWh
NOx
3 lb/MWh
SO₂
0.033 lb/MWh
CH₄
0.023 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
71.8%
Annual Net Gen
29 GWh
CO₂eq
1204 lb/MWh
Subregion
NPCC New England
2022
$820/kW
Est. Construction Cost
Total estimated cost: $3.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.NASHUA 13.8
Pricing Hub
.H.INTERNAL_HUB
Location Type
NETWORK NODE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo