Search plants, projects, owners, and states
238.2 MW Wind operating in Coconino, AZ
238.2 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2023
Operating Since
Coordinates
34.6815, -110.8017
County
Coconino, AZ
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | AES Corp | — |
| Owner(s) | AES Clean Energy | AES | — |
| Status | Operating | operating | — |
Chevelon Butte Wind Farm is a 238.2 MW wind power plant located in Coconino County, Arizona. The facility began operating in 2023 and is owned by AES, with AES Clean Energy serving as the operator. The plant utilizes one generator consisting of multiple onshore wind turbines. It is the second-largest of four wind farms in Arizona and ranks 194th out of 734 wind facilities nationally.
The wind farm's turbines have a hub height of 120 meters and a rotor diameter of 150 meters. The turbines were manufactured by Vestas, model V150-4.5. In its first year of operation, the Chevelon Butte Wind Farm generated 624,169 MWh of electricity, achieving a capacity factor of 30.0%. The plant operates within the Arizona Public Service Company balancing authority and is part of the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Mountain West
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Arizona Public Service Company (AZPS)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
34.7K MWh
Latest Month
624.2K MWh
Annual Generation
30.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,114/kW
Est. Construction Cost
Total estimated cost: $503.6M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Chevelon Butte Wind FarmForward forecasts, scenario decomposition, and risk-decision tooling for this asset.