Search plants, projects, owners, and states
1447.7 MW Natural Gas operating in Broward, FL
1,447.7 MW
Nameplate Capacity
3
Generators
units
Natural Gas Fired Combined Cycle
Technology
2022
Operating Since
Coordinates
26.0690, -80.1985
County
Broward, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Florida Power & Light Co | Florida Power & Light | — |
| Owner(s) | Florida Power & Light Co | NextEra Energy | — |
| Status | Operating | — | — |
Dania Beach 7 is a 1447.7 MW natural gas-fired combined cycle power plant located in Broward County, Florida. The plant began operating in 2022 and is owned by NextEra Energy and operated by Florida Power & Light Co (FPL). It consists of 3 generators utilizing combined cycle technology. Dania Beach 7 is the 16th largest power plant in Florida out of 51, and ranks 67th nationally out of 945 plants.
The plant's latest annual generation was 6,087,686 MWh, achieving a capacity factor of 47.9%. The installed cost was $615 per kW, according to FERC data. Dania Beach 7 operates within the Florida Power & Light Company balancing authority and the SERC NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Power & Light Company (FPL)
Grid Voltage
230.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
424.2K MWh
Latest Month
6.1M MWh
Annual Generation
47.9%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Combined cycle · Florida Power & Light Company · Data from 2022–2024
$623/kW
Installed Cost
$-4/kW
Annual CapEx
$27.0/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-05-31
View all 6 articlesForward forecasts, scenario decomposition, and risk-decision tooling for this asset.