Search plants, projects, owners, and states
12 MW BESS operating in Wood, OH
12 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2023
Operating Since
Coordinates
41.3826, -83.6112
County
Wood, OH
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | VESI 21 LLC | — | — |
| Owner(s) | VESI 21 LLC | — | — |
| Status | Operating | — | — |
The Bowling Green Energy Storage Project is a 12 MW battery energy storage system (BESS) located in Wood County, Ohio. The facility began operating in 2023 and is owned and operated by VESI 21 LLC. The plant utilizes lithium-ion batteries (LIB) and has a storage capacity of 12 MWh, providing a duration of 1 hour at full power. The primary fuel listed is MWH, indicating that the plant draws power from the grid to charge its batteries.
The Bowling Green Energy Storage Project operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. It is ranked as the 6th largest energy storage facility out of 10 in Ohio, and 722nd out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
−211 MWh
Net Charging
-2.6K MWh
Annual Net Energy
-2.5%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $16.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Bowling Green Electric Substation No 4 · 69 kV
Substation Distance
0.076 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
BOWL_GR469 KV BG4
Pricing Hub
AEP-DAYTON HUB
Location Type
Generation Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Bowling Green Energy Storage ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.