1254.8 MW Batteries (418 MW) + Solar Photovoltaic (837 MW) planned in Navarro, TX
1,254.8 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
Planned: —
Planned Operation
Coordinates
31.9141, -96.4135
County
Navarro, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solar Proponent LLC | Solar Proponent | — |
| Owner(s) | Solar Proponent LLC | Solar Proponent LLC | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Solar Proponent LLC
This entity is not yet in the GEM ownership database — chain unavailable.
Tehuacana Creek 1 Solar and BESS is a hybrid power plant located in Navarro County, Texas. The facility has a total capacity of 1254.8 MW and is operated by Solar Proponent LLC. It is a hybrid plant consisting of both solar photovoltaic and battery storage technologies. The plant has two generators and utilizes fixed tilt solar tracking.
Tehuacana Creek 1 is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. It is the largest solar plant in Texas out of 224 such plants, and the fifth-largest in the United States out of 514. The plant's primary fuel source is electricity (MWH).
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
—
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $1.9B
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Compare Texas vs California solar
Summary analysis with parallel narrative sections and visualizations.
Top 10 solar states
Data tables and metrics from the InfraSure database.