126.5 MW Distillate Oil operating in Monroe, FL
126.5 MW
Nameplate Capacity
7
Generators
units
Petroleum Liquids
Technology
1978
Operating Since
Coordinates
24.5633, -81.7342
County
Monroe, FL
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Utility Board of Key West City (FL) | Florida Municipal Power Agency | — |
| Owner(s) | Florida Municipal Power Agency | Florida Municipal Power Agency | — |
| Status | Operating | — | — |
The Stock Island plant is a 126.5 MW petroleum liquids-fueled power plant located in Monroe County, Florida. It began operating in 1978 and consists of 7 generators utilizing petroleum liquids technology. The plant is owned by Florida Municipal Power Agency and operated by Utility Board of Key West City. It is located within the Florida Municipal Power Pool balancing authority and the SERC NERC region.
In the most recent year with available data, the Stock Island plant generated 3,353 MWh of electricity, operating at a capacity factor of 0.3%. The plant is ranked 5th out of 5 similar plants in Florida and 54th out of 60 nationally.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Municipal Power Pool (FMPP)
Grid Voltage
138.0 kV
Regulatory Status
RE — Regulated
Entity Type
Municipal
Sector
Electric Utility
149 MWh
Latest Month
3.4K MWh
Annual Generation
0.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
379 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
0.405 lb/MWh
SO₂
0.001 lb/MWh
CH₄
0.084 lb/MWh
N₂O
0.017 lb/MWh
Capacity Factor
0.3%
Annual Net Gen
3 GWh
CO₂eq
386 lb/MWh
Subregion
FRCC All
2013
$765/kW
Est. Construction Cost
Total estimated cost: $96.7M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
Last updated 2026-03-26