Search plants, projects, owners, and states
375 MW Batteries (125 MW) + Solar Photovoltaic (250 MW) operating in Riverside, CA
375 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2023
Operating Since
Coordinates
33.7290, -115.3824
County
Riverside, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Intersect USA, LLC | Intersect Power | — |
| Owner(s) | IP Oberon LLC | Intersect Power | — |
| Status | Operating | operating | — |
GEM identifies the owner as Intersect Power
This entity is not yet in the GEM ownership database — chain unavailable.
The Oberon Solar Project is a 375 MW hybrid power plant located in Riverside County, California. The plant, which began operating in 2023, is owned and operated by IP Oberon LLC. It utilizes both solar photovoltaic technology and battery energy storage. The facility consists of two generators and features single-axis solar tracking. Oberon Solar is ranked as the 19th largest solar facility in California out of 112, and 110th nationally out of 514.
The plant's battery energy storage system (BESS) has a capacity of 500 MWh and a duration of 4 hours, utilizing lithium-ion battery chemistry. In its latest year of operation, the Oberon Solar Project generated 581,451 MWh, resulting in a capacity factor of 17.7%. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. Financial data is available for the plant from LBNL, and the plant has been featured in 10 news articles, with 6 focused on industry topics and 4 on regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
500.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
—
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
25.0K MWh
Latest Month
581.5K MWh
Annual Generation
17.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2023–2024
$6.4/MWh
Energy Value
$9.0/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
REDBLUFF_2_B1
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all 5 articlesTop solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.