5.7 MW Solar operating in Montgomery, MO
5.7 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2022
Operating Since
Coordinates
38.8924, -91.4238
County
Montgomery, MO
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Union Electric Co - (MO) | Union Electric | — |
| Owner(s) | Union Electric Co - (MO) | — | — |
| Status | Operating | operating | — |
The Montgomery County Community Solar Center is a 5.7 MW solar photovoltaic power plant located in Montgomery County, Missouri. The plant began operating in 2022 and is owned and operated by Union Electric Co. (MO). It utilizes single-axis tracking to maximize solar energy capture. As of the latest data, the plant ranks 17th out of 36 solar facilities in Missouri and 2151st nationally out of 7108 plants.
In its most recent year of operation, the Montgomery County Community Solar Center generated 8,831 MWh of electricity, achieving a capacity factor of 17.6%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. Financial data indicates an installed cost of $1,975.01 per kW, according to FERC data.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
34.5 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
348 MWh
Latest Month
8.8K MWh
Annual Generation
17.6%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Solar photovoltaic · UNION ELECTRIC COMPANY · Data from 2022–2024
$2,270/kW
Installed Cost
$2.0/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
FIXME Substation · 69 kV
Substation Distance
< 10 km
Coord Source
OSM spatial
Market Position
ISO/RTO Market
MISO
LMP Node
AMMO.UE
Pricing Hub
ILLINOIS.HUB
Location Type
Load Zone
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Montgomery County Community Solar CenterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.