100 MW BESS operating in Travis, TX
100 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2022
Operating Since
Coordinates
30.4123, -97.5739
County
Travis, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Key Capture Energy | — | — |
| Owner(s) | Key Capture Energy | — | — |
| Status | Operating | — | — |
TX12 Silicon Hill Storage is a 100 MW battery energy storage system located in Travis County, Texas. The plant began operating in 2022 and is owned and operated by Key Capture Energy. It is interconnected to the Electric Reliability Council of Texas (ERCOT) grid, within the TRE NERC region. The facility consists of a single generator utilizing batteries as its primary fuel source, specifically lithium-ion batteries (LIB). The battery system has a storage capacity of 100 MWh, providing a duration of 1 hour at full power.
The plant is ranked as the 206th largest in Texas out of 224 plants, and 488th nationally out of 514 plants. The plant's technology is classified as Batteries.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−745 MWh
Net Charging
-11.2K MWh
Annual Net Energy
-1.3%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2022
$1,205/kW
Est. Construction Cost
Total estimated cost: $120.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ERCOT
LMP Node
SLCN_ESS_ALL
Pricing Hub
HB_SOUTH
Alt. Hub / Zone
LZ_SOUTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about TX12 Silicon Hill Storage