70 MW Solar operating in Pasco, FL
70 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
28.1788, -82.1479
County
Pasco, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Tampa Electric Co | Tampa Electric | — |
| Owner(s) | Tampa Electric Co | Emera | — |
| Status | Operating | operating | — |
Juniper Solar is a 70 MW solar photovoltaic power plant located in Pasco County, Florida. The plant began operating in 2023 and is owned by Emera, a Canadian company. Tampa Electric Co is the listed operator per EIA data. The plant utilizes single-axis tracking technology to maximize solar energy capture. Juniper Solar is ranked 173rd out of 227 power plants in Florida and 1010th nationally out of 7108 plants.
In its latest year of operation, Juniper Solar generated 147,764 MWh of electricity, resulting in a capacity factor of 24.1%. The plant operates within the balancing authority of Tampa Electric Company and is located in the SERC NERC region. Financial data indicates an installed cost of $1,457 per kW.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Tampa Electric Company (TEC)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
8.0K MWh
Latest Month
147.8K MWh
Annual Generation
24.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Solar photovoltaic · Tampa Electric Company · Data from 2023–2024
$1,457/kW
Installed Cost
$6.4/MWh
Operating Cost
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Juniper Solar (FL)Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.