Search plants, projects, owners, and states
150 MW Solar planned in Pulaski, VA
150 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | AES Clean Energy | Hecate Energy | — |
| Owner(s) | AES Clean Energy | Hecate Energy; AgriSunPower LLC (ASP) | — |
| Status | Planned | pre-construction | — |
GEM identifies the owner as Hecate Energy; AgriSunPower LLC (ASP)
This entity is not yet in the GEM ownership database — chain unavailable.
Hecate Energy Pulaski 1 is a 150 MW solar photovoltaic power plant located in Pulaski County, Virginia. The plant, identified by plant ID 65665, utilizes fixed-tilt solar tracking technology. It is operated by AES Clean Energy and consists of a single generator. The plant is the 11th largest solar facility in Virginia out of 25, and ranks 352nd nationally out of 639 solar plants.
The plant's location within Virginia places it under the jurisdiction of the PJM Interconnection, LLC balancing authority and the RFC NERC region. The primary fuel source for Hecate Energy Pulaski 1 is solar energy (SUN).
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,543/kW
Est. Construction Cost
Total estimated cost: $231.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
DOMINION HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Hecate Energy Pulaski 1Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo