Search plants, projects, owners, and states
3.6 MW BESS operating in Richland, WI
3.6 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2023
Operating Since
Coordinates
43.3106, -90.5327
County
Richland, WI
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Wisconsin Power & Light Co | — | — |
| Owner(s) | Wisconsin Power & Light Co | — | — |
| Status | Operating | — | — |
The Boaz Microgrid Battery is a 3.6 MW battery energy storage system located in Richland County, Wisconsin. It began operating in 2023 and is owned and operated by Wisconsin Power & Light Co. The plant utilizes lithium-ion batteries (LIB) and has a total storage capacity of 3 MWh, providing a duration of approximately 0.83 hours at full output. The primary fuel type is listed as purchased electricity (MWH), indicating the batteries are charged from the grid.
The Boaz Microgrid Battery operates within the Midcontinent Independent Transmission System Operator (MISO) market and is under the balancing authority of MISO. In terms of size, it ranks as the 7th largest of 8 battery storage facilities in Wisconsin and 1045th nationally out of 1205 such plants. The plant is located within the Midwest Reliability Organization (MRO) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
−13 MWh
Net Charging
-111 MWh
Annual Net Energy
-0.4%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $4.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
ALTE.ALTE
Pricing Hub
MICHIGAN.HUB
Alt. Hub / Zone
MINN.HUB
Location Type
Load Zone
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Boaz Microgrid BatteryForward forecasts, scenario decomposition, and risk-decision tooling for this asset.