Search plants, projects, owners, and states
5.9 MW Batteries (2 MW) + Solar Photovoltaic (4 MW) operating in Kern, CA
5.9 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2024
Operating Since
Coordinates
35.4466, -119.0509
County
Kern, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solar Star Prime 3, LLC | Amazon | — |
| Owner(s) | Solar Star Prime 3, LLC | Solar Star Prime 3 LLC | — |
| Status | Operating | operating | — |
GEM identifies the owner as Solar Star Prime 3 LLC
This entity is not yet in the GEM ownership database — chain unavailable.
The Amazon Bakersfield 1 Solar Project is a 5.9 MW hybrid power plant located in Kern County, California. The facility, which began operating in 2024, is owned and operated by Solar Star Prime 3, LLC. The plant utilizes both solar photovoltaic technology and battery energy storage. It consists of two generators and employs a fixed tilt solar tracking system. According to state rankings, the plant is the 219th largest in California, and the 940th largest in the United States.
The plant's primary fuel source is listed as MWH, referring to the electricity generated. In its most recent year of operation, the Amazon Bakersfield 1 Solar Project generated 7,949 MWh of electricity, achieving a capacity factor of 15.3%. The battery energy storage system (BESS) has a storage capacity of 5.9 MWh and a duration of 3.69 hours, utilizing MAB battery chemistry. The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
12.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
378 MWh
Latest Month
7.9K MWh
Annual Generation
15.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $9.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
KERNOIL_1_N012
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Amazon Bakersfield 1 Solar ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.