Search plants, projects, owners, and states
20 MW Hydro operating in Linn, OR
20 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1968
Operating Since
Coordinates
44.4161, -122.6704
County
Linn, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USACE Northwestern Division | — | — |
| Owner(s) | USACE Northwestern Division | — | — |
| Status | Operating | — | — |
The Foster hydroelectric plant is located in Linn County, Oregon. The plant has a total capacity of 20 MW across two generators and came online in 1968. It is owned and operated by the USACE Northwestern Division. The primary fuel source is water (WAT), and the plant utilizes conventional hydroelectric technology. Foster is ranked as the 25th largest power plant in Oregon out of 63, and 489th nationally out of 1464.
In the most recent year of data, Foster generated 56,953 MWh of electricity, resulting in a capacity factor of 32.4%. The plant operates within the Western Electricity Coordinating Council (WECC) NERC region and is under the balancing authority of the Bonneville Power Administration.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
WEIM Participant
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Bonneville Power Administration (BPAT)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
6.1K MWh
Latest Month
57.0K MWh
Annual Generation
32.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $45.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant's balancing authority participates in CAISO's Western Energy Imbalance Market (WEIM). Direct nodal pricing data is not yet available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about FosterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.