180 MW Solar operating in Crittenden, AR
180 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
35.1569, -90.3105
County
Crittenden, AR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Entergy Arkansas LLC | NextEra Energy | — |
| Owner(s) | Entergy Arkansas LLC | NextEra Energy | — |
| Status | Operating | operating | — |
West Memphis Solar Station is a 180 MW solar photovoltaic power plant located in Crittenden County, Arkansas. The plant began operating in 2024 and is owned by NextEra Energy, with Entergy Arkansas LLC serving as the operator. The facility utilizes single-axis tracking technology to maximize solar energy capture. It is connected to the Midcontinent Independent Transmission System Operator, Inc. (MISO) balancing authority and resides within the SERC NERC region.
The plant's latest annual generation was 347,258 MWh, resulting in a capacity factor of 22.0%. West Memphis Solar Station ranks as the 6th largest solar plant in Arkansas out of 16, and 288th nationally out of 639. Financial data is available for the plant from LBNL, though specific metrics are not provided in this dataset.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
161.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
13.3K MWh
Latest Month
347.3K MWh
Annual Generation
22.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2024
$39.4/MWh
LCOE
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
EAI.WMPSOL
Pricing Hub
ARKANSAS.HUB
Location Type
Generation Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.