Search plants, projects, owners, and states
74.5 MW Solar operating in Okeechobee, FL
74.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
30.2801, -82.7788
County
Okeechobee, FL
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Florida Power & Light Co | Florida Power & Light | — |
| Owner(s) | Florida Power & Light Co | NextEra Energy | — |
| Status | Operating | operating | — |
FPL Cavendish Solar Energy Center is a 74.5 MW solar photovoltaic plant located in Okeechobee County, Florida. The plant began operating in 2023 and has one generator. It is owned by NextEra Energy and operated by Florida Power & Light Co. The plant's primary fuel source is solar energy. It is ranked 146th out of 227 power plants in Florida and 958th out of 7108 plants nationally. The solar panels utilize a fixed tilt tracking system. The plant operates within the Florida Power & Light Company balancing authority, within the SERC NERC region.
In its most recent year of operation, FPL Cavendish Solar Energy Center generated 116,139 MWh of electricity, resulting in a capacity factor of 17.8%. Financial data indicates an installed cost of $1,133 per kW, as reported to FERC.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
Bilateral Market
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Florida Power & Light Company (FPL)
Grid Voltage
115.0 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
9.3K MWh
Latest Month
116.1K MWh
Annual Generation
17.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Solar photovoltaic · Florida Power & Light Company · Data from 2023–2024
$1,139/kW
Installed Cost
$6/kW
Annual CapEx
$1.0/MWh
Operating Cost
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
FPL Cavendish Solar Energy Center
Data-driven briefing on FPL Cavendish Solar Energy Center — fleet, generation, financial, and news signals.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.