484 MW Natural Gas operating in Brazoria, TX
484 MW
Nameplate Capacity
8
Generators
units
Natural Gas Fired Combustion Turbine
Technology
2023
Operating Since
Coordinates
29.3642, -95.4351
County
Brazoria, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ProEnergy Services | ProEnergy Services | — |
| Owner(s) | Brotman Generating, LLC, ProEnergy Services | ACON Investments | — |
| Status | Operating | — | — |
Brotman Power Station is a 484 MW natural gas-fired power plant located in Brazoria County, Texas. The plant began operating in 2023 and consists of eight natural gas-fired combustion turbine generators. It is owned by ACON Investments and operated by ProEnergy Services. The plant's location places it within the Electric Reliability Council of Texas (ERCOT) balancing authority and the Texas Reliability Entity (TRE) NERC region.
In its most recent year of operation, Brotman Power Station generated 298,742 MWh of electricity, achieving a capacity factor of 7.0%. Brotman ranks as the 79th largest power plant in Texas out of 144, and 497th nationally out of 945 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
8.8K MWh
Latest Month
298.7K MWh
Annual Generation
7.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →CO₂ Intensity
1231 lb/MWh
NOx
0.129 lb/MWh
SO₂
0.006 lb/MWh
CH₄
0.022 lb/MWh
N₂O
0.002 lb/MWh
Capacity Factor
7.5%
Annual Net Gen
239 GWh
CO₂eq
1232 lb/MWh
Subregion
ERCOT All
2023
$782/kW
Est. Construction Cost
Total estimated cost: $378.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Rosharon Substation · 138 kV
Substation Distance
< 10 km
Operator
CenterPoint Energy
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
ACHBTM01
Pricing Hub
HB_HOUSTON
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.