Search plants, projects, owners, and states
16.4 MW Solar planned in York, ME
16.4 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
Planned: —
Planned Operation
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
43.6434, -70.5584
Reference point reported to EIA.
County
York, ME
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 42.555 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Emery Meadow Solar Station, LLC | Emery Meadow Solar Station | — |
| Owner(s) | Emery Meadow Solar Station, LLC | — | — |
| Status | Planned | pre-construction | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Emery Meadow Solar Station is a 16.4 MW solar photovoltaic power plant located in York County, Maine. The plant, identified by plant ID 65366, is owned and operated by Emery Meadow Solar Station, LLC. It consists of a single generator utilizing fixed-tilt solar tracking technology. The primary fuel source for the facility is solar energy (SUN).
The plant operates within the ISO New England Inc. balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. Emery Meadow Solar Station is ranked as the 13th largest solar facility in Maine out of 153, and nationally it holds a rank of 1634 out of 7108 solar plants. Recent news coverage related to the plant has focused on regulatory matters.
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
34.5 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $42.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Buxton Substation · 345 kV
Substation Distance
< 10 km
Operator
Central Maine Power Company
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.W_BUXTON34.5
Pricing Hub
.Z.MAINE
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Oxy Renewable Energy queue pipeline — 1 projects by technology and status
Summary analysis with parallel narrative sections and visualizations.
Solar Solar growth signals — PPAs, construction, new projects
Summary analysis with parallel narrative sections and visualizations.
Emery Meadow Solar Station
Data-driven briefing on Emery Meadow Solar Station — fleet, generation, financial, and news signals.
State-by-state breakdown for ISO New England
Summary analysis with parallel narrative sections and visualizations.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.