121.3 MW Wind operating in Ford, IL
121.3 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2022
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
40.5563, -88.3495
Reference point reported to EIA.
County
Ford, IL
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 11.817 km. The line reaches both facility footprints in the source data.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
Sources can describe different roles or reporting dates. The source-specific values below are retained for comparison.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Ford Ridge | Stonepeak Partners LP; Ørsted A/S | — |
| Owner(s) | Ford Ridge | Stonepeak Partners LP; Ørsted A/S | — |
| Status | Operating | operating | — |
Summary generated Mar 21, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Ford County Wind Farm LLC is a 121.3 MW wind power plant located in Ford County, Illinois. The facility began operating in 2022 and is owned and operated by Ford Ridge. The plant utilizes a single generator consisting of onshore wind turbines. The wind turbines have a hub height of 89 meters and a rotor diameter of 127 meters, and were manufactured by GE Wind, model GE2.8-127.
In its most recent year of operation, the plant generated 464,720 MWh of electricity, achieving a capacity factor of 43.8%. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. Ford County Wind Farm ranks as the 37th largest wind farm in Illinois out of 44, and 606th nationally out of 734.
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
51.9K MWh
Latest Month
464.7K MWh
Annual Generation
43.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2022
$1,686/kW
Est. Construction Cost
Total estimated cost: $204.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
MISO
LMP Node
AMIL.FORDCO1
Pricing Hub
ILLINOIS.HUB
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesOE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Ford County Wind Farm LLC
Data-driven briefing on Ford County Wind Farm LLC — fleet, generation, financial, and news signals.
OE IL Solar 3
Cross-dimensional entity briefing with KPIs, news intelligence, and fleet analysis.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.