Search plants, projects, owners, and states
62.5 MW Batteries (13 MW) + Solar Photovoltaic (50 MW) operating in New Castle, DE
62.5 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2022
Operating Since
Coordinates
39.3952, -75.7535
County
New Castle, DE
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | ENGIE Solidago Solar LLC | ENGIE | — |
| Owner(s) | ENGIE Solidago Solar LLC | ENGIE | — |
| Status | Operating | operating | — |
The ENGIE Solidago Solar Project - Hybrid is a 62.5 MW hybrid power plant located in New Castle County, Delaware. The facility, which began operating in 2022, is owned by ENGIE, a company based in France, and operated by ENGIE Solidago Solar LLC. The plant utilizes both solar photovoltaic technology and batteries, with a single-axis solar tracking system. It is currently ranked as the largest solar facility in Delaware and 574th nationally out of 1205 solar plants.
The plant's primary fuel source is listed as MWH. In its most recent year of operation, the ENGIE Solidago Solar Project - Hybrid generated 97,547 MWh of electricity, achieving a capacity factor of 17.8%. The facility operates within the PJM Interconnection, LLC balancing authority and the RFC NERC region. Financial data is available for the plant from LBNL, indicating that it is part of their solar data collection.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
RFC
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
3.5K MWh
Latest Month
97.5K MWh
Annual Generation
17.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2022–2024
$31.6/MWh
Energy Value
$7.2/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Townsend Substation · 138 kV
Substation Distance
0.795 km
Operator
Delmarva Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
PJM
LMP Node
TOWNSEND138 KV TOWNSP
Pricing Hub
WESTERN HUB
Alt. Hub / Zone
DOMINION HUB
Location Type
Generation Node
Node Source
Curated node match
Last updated 2026-04-09
View all articlesNo Ask reports yet for this entity.
Ask about ENGIE Solidago Solar Project - HybridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo