Search plants, projects, owners, and states
2.6 MW Hydro out of service in Clinton, NY
2.6 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1926
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
44.5233, -73.4609
Reference point calculated from the selected footprint.
Mapped site outline
Site outline mapped in OpenStreetMap. It is not a surveyed or legal boundary.
County
Clinton, NY
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 3.302 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | New York State Elec & Gas Corp | — | — |
| Owner(s) | New York State Elec & Gas Corp | — | — |
| Status | Out of service | — | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
Rainbow Falls Auscble is a hydroelectric power plant located in Clinton County, New York. The plant, which began operating in 1926, has a total capacity of 2.6 MW derived from two generators utilizing conventional hydroelectric technology. It is owned and operated by New York State Electric & Gas Corp. The plant's primary fuel source is water (WAT). Rainbow Falls Auscble operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region.
In the most recent year with available data, Rainbow Falls Auscble generated 10,271 MWh of electricity, achieving a capacity factor of 45.0%. The plant's installed cost was $3,055.75 per kW, according to FERC data. Rainbow Falls Auscble ranks as the 117th largest power plant in New York out of 165 plants, and 1131st nationally out of 1464 plants.
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
2.3 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
377 MWh
Latest Month
10.3K MWh
Annual Generation
45.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Hydroelectric · New York State Electric & Gas Corporation · Data from 2015–2024
$10,633/kW
Installed Cost
$55773.3/MWh
Operating Cost
Annual Capital & Operating Expenses
Cumulative Installed Cost
Per-Unit Cost Trends
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
NEG NORTH___PLATTSBURG
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
23628
Pricing Hub
NORTH
Node Source
EIA-860 direct report
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
New York in New York growth signals — PPAs, construction, new projects
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
Rainbow Falls Auscble
Data-driven briefing on Rainbow Falls Auscble — fleet, generation, financial, and news signals.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.