50 MW BESS operating in Brazoria, TX
50 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2022
Operating Since
Coordinates
29.0561, -95.6868
County
Brazoria, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Byrd Ranch Storage LLC | — | — |
| Owner(s) | Byrd Ranch Storage LLC | — | — |
| Status | Operating | — | — |
Byrd Ranch Storage is a 50 MW battery energy storage system (BESS) located in Brazoria County, Texas. The plant, which began operating in 2022, is owned and operated by Byrd Ranch Storage LLC. It consists of a single generator utilizing lithium-ion battery (LIB) chemistry. The facility has a total storage capacity of 50 MWh, providing a duration of 1 hour at its full power output.
Byrd Ranch Storage operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. According to available data, the plant ranks 237th in size among power plants in Texas and 616th nationally. The plant's primary fuel type is electricity (MWH), indicating that it charges from the grid and discharges to it as needed.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−323 MWh
Net Charging
-3.5K MWh
Annual Net Energy
-0.8%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2022
$1,205/kW
Est. Construction Cost
Total estimated cost: $60.3M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
Sweeny Substation · 138 kV
Substation Distance
0 km
Operator
Texas-New Mexico Power
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
BYRDR_ES_ALL
Pricing Hub
HB_HOUSTON
Alt. Hub / Zone
LZ_HOUSTON
Location Type
Resource Node
Node Source
Curated node match
Last updated 2026-03-14
View all 6 articlesNo Ask reports yet for this entity.
Ask about Byrd Ranch StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo