Search plants, projects, owners, and states
5 MW BESS operating in Brunswick, NC
5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2024
Operating Since
Coordinates
33.9939, -78.2245
County
Brunswick, NC
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | North Carolina El Member Corp | — | — |
| Owner(s) | North Carolina El Member Corp | — | — |
| Status | Operating | — | — |
Zion Hill BESS is a 5 MW battery energy storage system located in Brunswick County, North Carolina. The plant began operating in 2024 and is owned and operated by North Carolina Electric Membership Corporation. It is connected to the Duke Energy Progress East balancing authority within the SERC NERC region. The facility ranks as the 17th largest of 36 battery storage sites in North Carolina, and 963rd nationally out of 1205 such sites.
The Zion Hill BESS utilizes lithium-ion battery chemistry and has a total storage capacity of 10 MWh, providing a duration of 2 hours at its full 5 MW output. The plant consists of a single generator. The primary fuel type is listed as 'MWH', indicating that it draws power from the grid to charge its batteries.
Generated from EIA, GEM, and public data sources
Grid Region
Southeast
Market
SEEM Participant
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Duke Energy Progress East (CPLE)
Grid Voltage
13.2 kV
Regulatory Status
RE — Regulated
Entity Type
Cooperative
Sector
Electric Utility
−29 MWh
Net Charging
-473 MWh
Annual Net Energy
-1.1%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $6.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →This plant's balancing authority participates in the Southeast Energy Exchange Market (SEEM). SEEM is a bilateral exchange — no public nodal pricing.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Zion Hill BESSForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo