5 MW BESS operating in Queens, NY
5 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2025
Operating Since
Coordinates
40.7404, -73.9511
County
Queens, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Agilitas Energy, Inc. | — | — |
| Owner(s) | AE-ESS NWS, LLC | — | — |
| Status | Operating | — | — |
AE-ESS NWS 1, LLC is a 5 MW battery energy storage system located in Queens County, New York. The plant, identified by the EIA plant code 65239, began operating in 2025 and has one generator. Agilitas Energy, Inc. is the plant's operator. The facility is connected to the New York Independent System Operator (NYISO) balancing authority and is within the Northeast Power Coordinating Council (NPCC) NERC region.
The plant utilizes batteries as its primary fuel source, categorized as "MWH" in the data. The battery energy storage system (BESS) has a duration of 4.92 hours. In terms of size, AE-ESS NWS 1, LLC ranks as the 42nd largest of 65 plants in New York state and 983rd nationally out of 1205 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.2 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $6.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
NYPA_VERNON_____GT2
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
N.Y.C.
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about AE-ESS NWS 1, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.