Search plants, projects, owners, and states
Canceled or postponed, according to EIA. Last listed as operating or planned in August 2025. EIA-860M · Sep 2026
30 MW BESS in Buckingham, VA
30 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
—
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Coordinates
37.7622, -78.4791
County
Buckingham, VA
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Deer Wood Storage, LLC | — | — |
| Owner(s) | Deer Wood Storage, LLC | — | — |
| Status | Canceled or postponed | — | — |
Deer Wood Storage, LLC is a 30 MW battery energy storage system located in Buckingham County, Virginia. The plant, identified by the EIA plant code 65145, is owned and operated by Deer Wood Storage, LLC. It consists of a single generator utilizing battery technology and reports its primary fuel as MWH (megawatt-hours), indicating the flow of electricity for storage and discharge.
The facility operates within the PJM Interconnection, LLC balancing authority, which is part of the SERC Reliability Corporation (SERC) NERC region. Deer Wood Storage is ranked as the 10th largest of 12 energy storage facilities in Virginia, and 654th nationally out of 1205 similar plants. Recent news coverage related to the plant has focused on regulatory matters.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
138.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
No generation data available for this plant.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,361/kW
Est. Construction Cost
Total estimated cost: $40.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
—
Pricing Hub
DOMINION HUB
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-14
View all articlesNo Ask reports yet for this entity.
Ask about Deer Wood Storage, LLCForward forecasts, scenario decomposition, and risk-decision tooling for this asset.