1.5 MW Solar operating in Middlesex, CT
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2024
Operating Since
Coordinates
41.5972, -72.7193
County
Middlesex, CT
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | VCP Realty, LLC | VCP, LLC d/b/a Verogy | — |
| Owner(s) | VCP Realty, LLC | — | — |
| Status | Operating | operating | — |
FedEx Middletown is a 1.5 MW solar photovoltaic power plant located in Middlesex County, Connecticut. The plant began operating in 2024 and has one generator. VCP Realty, LLC is the owner and operator. The facility utilizes a fixed tilt solar tracking system.
In its most recent year of operation, FedEx Middletown generated 151 MWh of electricity, resulting in a capacity factor of 1.1%. The plant is connected to the grid and operates within the ISO New England Inc. balancing authority and the NPCC NERC region. FedEx Middletown is ranked as the 55th largest solar plant in Connecticut out of 88, and 5808th nationally out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
ISO-NE
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
ISO New England Inc. (ISNE)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
96 MWh
Latest Month
151 MWh
Annual Generation
1.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$2,584/kW
Est. Construction Cost
Total estimated cost: $3.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ISO-NE
LMP Node
LD.BERLIN 13.8
Pricing Hub
.Z.CONNECTICUT
Location Type
NETWORK NODE
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about FedEx MiddletownForward forecasts, scenario decomposition, and risk-decision tooling for this asset.