Search plants, projects, owners, and states
2 MW Solar operating in Boone, KY
2 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2023
Operating Since
Coordinates
38.9064, -76.8667
County
Boone, KY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Duke Energy Kentucky Inc | Duke Energy Kentucky | — |
| Owner(s) | Duke Energy Kentucky Inc | Duke Energy | — |
| Status | Operating | operating | — |
The Aero Solar Facility is a 2 MW solar photovoltaic power plant located in Boone County, Kentucky. The plant began operating in 2023 and has a single generator. It is owned by Duke Energy and operated by Duke Energy Kentucky Inc. The facility's primary fuel source is solar energy.
In its most recent year of operation, the Aero Solar Facility generated 2,907 MWh of electricity, achieving a capacity factor of 16.5%. The plant uses a fixed tilt solar tracking system. The facility operates within the PJM Interconnection, LLC balancing authority and the SERC NERC region. Aero Solar Facility is ranked as the 29th largest solar plant in Kentucky out of 31, and nationally it is ranked 4627 out of 7108.
Generated from EIA, GEM, and public data sources
ISO/RTO
PJM
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
PJM Interconnection, LLC (PJM)
Grid Voltage
12.47 kV
Regulatory Status
RE — Regulated
Entity Type
Investor-Owned Utility
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
100 MWh
Latest Month
2.9K MWh
Annual Generation
16.5%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2024
$32.1/MWh
Energy Value
$7.5/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
PJM
LMP Node
AERO1 138 KV LOAD4
Pricing Hub
AEP-DAYTON HUB
Location Type
Load Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.