Search plants, projects, owners, and states
151.7 MW Solar operating in Wasco, OR
151.7 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2025
Operating Since
Coordinates
45.1318, -120.8807
County
Wasco, OR
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Avangrid Power LLC | Avangrid Renewables | — |
| Owner(s) | Avangrid Power LLC | Avangrid Inc | — |
| Status | Operating | operating | — |
Daybreak Solar is a 151.7 MW solar photovoltaic power plant located in Wasco County, Oregon. The plant began operating in 2025 and is owned and operated by Avangrid Power LLC. It utilizes a single generator and fixed-tilt solar tracking technology. Daybreak Solar ranks as the 5th largest of 7 solar plants in Oregon, and 345th nationally out of 639 plants.
The plant's primary fuel source is solar energy. In its latest year of operation, Daybreak Solar generated 314,583 MWh of electricity, achieving a capacity factor of 28.2%. The balancing authority for the plant is Avangrid Renewables LLC, and it operates within the Western Electricity Coordinating Council (WECC) NERC region.
Generated from EIA, GEM, and public data sources
Grid Region
Pacific Northwest
Market
Bilateral Market
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
Avangrid Renewables LLC (AVRN)
Grid Voltage
230.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
9.1K MWh
Latest Month
314.6K MWh
Annual Generation
28.2%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2023
$1,544/kW
Est. Construction Cost
Total estimated cost: $234.2M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
This plant is in a bilateral market territory without organized wholesale pricing. Nodal pricing data is not available.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Daybreak SolarForward forecasts, scenario decomposition, and risk-decision tooling for this asset.