Search plants, projects, owners, and states
9.9 MW BESS operating in Reeves, TX
9.9 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2021
Operating Since
Coordinates
31.1968, -103.3617
County
Reeves, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Flower Valley | — | — |
| Owner(s) | Flower Valley | — | — |
| Status | Operating | — | — |
Flower Valley I is a 9.9 MW battery energy storage system (BESS) located in Reeves County, Texas. The plant began operating in 2021 and is owned and operated by Flower Valley. It is connected to the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority. The plant ranks 275th in size out of 313 power plants in Texas, and 813th nationally out of 1205 plants.
The facility consists of a single generator utilizing battery storage technology. The BESS has a total storage capacity of 19.8 MWh, providing a duration of 2 hours. The battery chemistry is lithium-ion (LIB). There has been one news article published about the plant, related to hazards. The plant's primary fuel is listed as MWH.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
25.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−73 MWh
Net Charging
-776 MWh
Annual Net Energy
-0.9%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2021
$1,796/kW
Est. Construction Cost
Total estimated cost: $17.8M
Market Position
ISO/RTO Market
ERCOT
LMP Node
TNFLATTOP_1Z
Pricing Hub
HB_WEST
Node Source
EIA-860 direct report
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Flower Valley I