1.2 MW Natural Gas operating in Wichita, TX
1.2 MW
Nameplate Capacity
3
Generators
units
Natural Gas Internal Combustion Engine
Technology
2021
Operating Since
Coordinates
33.8570, -98.4990
County
Wichita, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Walmart Stores Texas, LLC | — | — |
| Owner(s) | Walmart Stores Texas, LLC | — | — |
| Status | Operating | — | — |
WAL414 is a natural gas-fired power plant located in Wichita County, Texas. The plant, owned and operated by Walmart Stores Texas, LLC, has a total capacity of 1.2 MW consisting of three natural gas internal combustion engine generators. The plant began operating in 2021.
In its most recent year of operation, WAL414 generated 153 MWh of electricity, resulting in a capacity factor of 1.4%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority. According to state rankings, WAL414 is the 297th largest power plant in Texas out of 312 plants. Nationally, it is ranked 1851 out of 1963 plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Commercial
Sector
Commercial Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
11 MWh
Latest Month
153 MWh
Annual Generation
1.4%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
CO₂ Intensity
1837 lb/MWh
Low-utilization plant — per-MWh rate is dominated by startup/standby emissions; not directly comparable to baseload averages.
NOx
36 lb/MWh
SO₂
0.050 lb/MWh
CH₄
0.035 lb/MWh
N₂O
0.003 lb/MWh
Capacity Factor
2.2%
Annual Net Gen
0 GWh
CO₂eq
1839 lb/MWh
Subregion
ERCOT All
2021
$920/kW
Est. Construction Cost
Total estimated cost: $1.1M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
ERCOT
LMP Node
—
Pricing Hub
HB_NORTH
Node Source
OSM spatial match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about WAL414Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.