Search plants, projects, owners, and states
24.7 MW BESS operating in Wyoming, NY
24.7 MW
Nameplate Capacity
1
Generators
unit
Batteries
Technology
2022
Operating Since
Coordinates
42.7387, -78.2397
County
Wyoming, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Invenergy Services LLC | Invenergy Services | — |
| Owner(s) | Invenergy Services LLC | Invenergy | — |
| Status | Operating | — | — |
Orangeville Storage is a 24.7 MW battery energy storage system (BESS) located in Wyoming County, New York. The plant began operating in 2022 and is owned and operated by Invenergy. It is interconnected to the New York Independent System Operator (NYISO) balancing authority. The plant ranks 10th out of 65 facilities in New York and 673rd nationally.
The facility consists of a single generator utilizing battery technology. The BESS has a storage capacity of 20 MWh and a duration of 0.81 hours. The battery chemistry is lithium-ion (LIB). The plant's primary fuel is electricity (MWH).
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
20.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
−282 MWh
Net Charging
-4.5K MWh
Annual Net Energy
-2.0%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2022
$1,205/kW
Est. Construction Cost
Total estimated cost: $29.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Point of Interconnection
Nearest Substation
WETHRSFD_WT_PWR
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
NYISO Zone C
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Orangeville StorageForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo