Search plants, projects, owners, and states
1.5 MW Solar operating in Adams, IL
1.5 MW
Nameplate Capacity
1
Generators
unit
Solar Photovoltaic
Technology
2021
Operating Since
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Luminace Solar Illinois 2, LLC | Luminace Solar Illinois 2 | — |
| Owner(s) | Luminace Solar Illinois 2, LLC | — | — |
| Status | Operating | operating | — |
The JM Huber at Quincy is a 1.5 MW solar photovoltaic power plant located in Adams County, Illinois. The plant began operating in 2021 and has one generator. It is owned and operated by Luminace Solar Illinois 2, LLC. The plant's primary fuel source is solar (SUN).
In its most recent year of operation, the JM Huber at Quincy plant generated 2,204 MWh of electricity, achieving a capacity factor of 16.7%. The solar panels utilize a fixed-tilt tracking system. The plant operates within the Midcontinent Independent Transmission System Operator (MISO) balancing authority and the SERC NERC region. In terms of size, the plant ranks 291st out of 320 power plants in Illinois, and 5814th out of 7108 plants nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
MISO
Market
ISO/RTO Member
NERC Region
SERC — SERC Reliability Corporation
Balancing Authority
Midcontinent Independent Transmission System Operator, Inc.. (MISO)
Grid Voltage
0.48 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
91 MWh
Latest Month
2.2K MWh
Annual Generation
16.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →Data from 2022–2024
$28.7/MWh
Energy Value
$2.4/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
MISO
LMP Node
—
Pricing Hub
ILLINOIS.HUB
Node Source
OSM spatial match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about JM Huber at QuincyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo