2.1 MW Batteries (0 MW) + Solar Photovoltaic (2 MW) operating in San Diego, CA
2.1 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2020
Operating Since
One connected view of the asset's ownership, operating or development evidence, grid context, commercial relationships, history, and forward outlook.
Expand a branch, then select a fact to jump to its full section. Locked leaves open a contextual request.
Plant reference point
32.8336, -117.1302
Reference point calculated from the selected footprint.
PV array footprint
Array footprint from USGS/LBNL imagery. It is not the complete site or a legal parcel.
Source imagery: 2024-11-17.
County
San Diego, CA
Nearby Plants
The starting substation is nearby, but its connection to this plant is unconfirmed.
1 mapped line section connects the two facilities over 2.491 km. At least one endpoint uses a nearby spatial match.
The actual electrical circuit, the official point of interconnection (POI), and the market settlement node require separate evidence.
Source checked 26 Oct 2026. Facility colors and shapes indicate source-reported function, not ownership or a confirmed plant connection.
This release uses a national source capture. Coverage and electrical detail vary by location; missing map data does not mean there is no connection. Lettered substation names are display labels where the source has no name. They do not identify ownership or function.
Source snapshot: 25 Oct 2026.
Reverse views of the same physical route are grouped in the route selector. All source records are retained.
Method: source-node-path-v2 · Release: gcr-73c6ce9c596ada3ec63d5523
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Solar Star California LXXVIII, LLC | Solar Star California LXXVIII | — |
| Owner(s) | 53 SP Solar Trust, Solar Star California LXXVIII, LLC | — | — |
| Status | Operating | operating | — |
Summary generated Mar 22, 2026 (UTC).
Source dates used by this summary were not recorded.
These may postdate the saved summary; they do not establish which inputs it used.
The County of San Diego COC Hybrid is a 2.1 MW hybrid power plant located in San Diego County, California. The plant, which came online in 2020, is owned and operated by Solar Star California LXXVIII, LLC. It utilizes both solar photovoltaic and battery storage technologies, with a 1 MWh battery energy storage system (BESS) providing 2.5 hours of duration. The BESS uses lithium-ion battery chemistry. The solar array employs a fixed tilt tracking system.
The plant operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. In its latest year of operation, the plant generated 3,093 MWh, achieving a capacity factor of 16.8%. The County of San Diego COC Hybrid ranks 263rd out of 300 power plants in California and 1105th out of 1205 plants nationally.
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
15.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Connection evidence
Mapped route candidate
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
148 MWh
Latest Month
3.1K MWh
Annual Generation
16.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2021–2024
$13.8/MWh
Energy Value
$11.8/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Kearny Substation · 69 kV
Substation Distance
0.122 km
Operator
San Diego Gas & Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
CAISO
LMP Node
KEARNEY_7_N001
Pricing Hub
TH_SP15_GEN-APND
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about County of San Diego COC HybridForward forecasts, scenario decomposition, and risk-decision tooling for this asset.