Search plants, projects, owners, and states
365 MW Batteries (132 MW) + Solar Photovoltaic (233 MW) operating in Riverside, CA
365 MW
Nameplate Capacity
3
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2022
Operating Since
Coordinates
33.7057, -114.7861
County
Riverside, CA
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Arlington Energy Center II | NextEra Energy | — |
| Owner(s) | Arlington Energy Center II | NextEra Energy | — |
| Status | Operating | operating | — |
Arlington Energy Center II is a 365 MW hybrid solar and battery energy storage system (BESS) located in Riverside County, California. The plant, which began operating in 2022, is owned and operated by NextEra Energy. It utilizes both solar photovoltaic technology with single-axis tracking and a battery energy storage system. The BESS component has a storage capacity of 528 MWh and a duration of 4 hours, employing lithium-ion battery chemistry.
The facility's latest annual generation was 633,467 MWh, resulting in a capacity factor of 19.8%. Arlington Energy Center II operates within the California Independent System Operator (CAISO) balancing authority and the Western Electricity Coordinating Council (WECC) NERC region. The plant ranks as the 4th largest solar facility out of 59 in California, and 51st out of 639 nationally. Financial data indicates a power purchase agreement (PPA) price of $22.56 per MWh.
Generated from EIA, GEM, and public data sources
ISO/RTO
CAISO
Market
ISO/RTO Member
NERC Region
WECC — Western Electricity Coordinating Council
Balancing Authority
California Independent System Operator (CISO)
Grid Voltage
220.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
34.6K MWh
Latest Month
633.5K MWh
Annual Generation
19.8%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Historic financial signal for this asset — PPA, LCOE, market value where reported. The base for forward bankability and insurance analytics on the InfraSure platform.
Data from 2023–2024
$10.9/MWh
Energy Value
$6.8/MWh
Capacity Value
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
CAISO
LMP Node
SUNCAT_7_CN1
Pricing Hub
TH_SP15_GEN-APND
Location Type
Pricing Node
Node Source
Curated node match
1 buyer • 16 active contracts
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
Top solar plant owners in the US
Data tables and metrics from the InfraSure database.
NextEra vs Duke
Comparative analysis covering fleet scale, performance trends, and growth pipeline.
Top 10 solar states
Data tables and metrics from the InfraSure database.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.