Search plants, projects, owners, and states
1.2 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) operating in Westchester, NY
1.2 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2022
Operating Since
Coordinates
41.1000, -73.7715
County
Westchester, NY
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | RWE Clean Energy | — | — |
| Owner(s) | Consolidated Edison Solutions Inc. | — | — |
| Status | Operating | — | — |
The Mt Pleasant Community Center is a hybrid power plant located in Westchester County, New York. The facility, owned and operated by Consolidated Edison Solutions Inc., began operation in 2022. It has a total capacity of 1.2 MW derived from two generators utilizing both solar photovoltaic and battery storage technologies. The battery energy storage system (BESS) has a capacity of 3 MWh, providing 4.29 hours of duration and employing lithium-ion battery (LIB) chemistry. The solar array uses a fixed-tilt tracking system.
The plant's primary fuel is reported as 'MWH' in regulatory filings, reflecting its hybrid nature. In its most recent year of operation, the Mt Pleasant Community Center generated 718 MWh of electricity, achieving a capacity factor of 6.8%. The plant operates within the New York Independent System Operator (NYISO) balancing authority and the Northeast Power Coordinating Council (NPCC) NERC region. It is ranked as the 64th largest plant out of 65 in New York State, and 1183rd out of 1205 nationally.
Generated from EIA, GEM, and public data sources
ISO/RTO
NYISO
Market
ISO/RTO Member
NERC Region
NPCC — Northeast Power Coordinating Council
Balancing Authority
New York Independent System Operator (NYIS)
Grid Voltage
13.8 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
29 MWh
Net Discharge
718 MWh
Annual Net Energy
6.8%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2022
$1,205/kW
Est. Construction Cost
Total estimated cost: $1.4M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
PLSNTVLE_13_KV_13KVDISA_REV_LBMP_I
Substation Distance
< 10 km
Coord Source
NYISO direct
Market Position
ISO/RTO Market
NYISO
LMP Node
—
Pricing Hub
DUNWOD
Node Source
Shared substation inference
Substation identified. Node ID not yet resolved against ISO roster.
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
No insights linked yet for this plant.
Insights enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
No Ask reports yet for this entity.
Ask about Mt Pleasant Community CenterForward forecasts, scenario decomposition, and risk-decision tooling for this asset.