128 MW Wind operating in Kingman, KS
128 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2021
Operating Since
Coordinates
37.4509, -98.4023
County
Kingman, KS
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Invenergy Services LLC | BP Wind Energy | — |
| Owner(s) | Invenergy Services LLC | Invenergy | — |
| Status | Operating | retired | — |
Flat Ridge 3 is a 128 MW wind power plant located in Kingman County, Kansas. The facility began operating in 2021 and is owned and operated by Invenergy Services LLC, a subsidiary of Invenergy. The plant utilizes one onshore wind turbine generator. The facility uses Vestas V110-2.0 turbines, with a rotor diameter of 110 meters and a hub height of 80 meters.
In its most recent year of operation, Flat Ridge 3 generated 459,065 MWh of electricity, achieving a capacity factor of 41.0%. The plant is interconnected to the Southwest Power Pool (SPP) balancing authority. Flat Ridge 3 ranks as the 40th largest power plant in Kansas out of 44, and 588th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
43.8K MWh
Latest Month
459.1K MWh
Annual Generation
41.0%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2021
$1,562/kW
Est. Construction Cost
Total estimated cost: $199.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Market Position
ISO/RTO Market
SPP
LMP Node
WR.FLATRIDGE3
Pricing Hub
SPPNORTH_HUB
Location Type
Settlement Location
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about Flat Ridge 3Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.