201.5 MW Wind operating in Caddo, OK
201.5 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2024
Operating Since
Coordinates
34.9743, -98.1852
County
Caddo, OK
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →Owner data does not fully agree across sources.
EIA typically reports the operating utility, while GEM resolves to the financial owner or parent corporation. Both can be correct.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | White Rock Wind East, LLC | TransAlta Corp | — |
| Owner(s) | White Rock Wind East, LLC | TransAlta | — |
| Status | Operating | operating | — |
The White Rock East Wind Project is a 201.5 MW wind farm located in Caddo County, Oklahoma. The facility began operating in 2024 and is owned by TransAlta, a Canadian company, and operated by White Rock Wind East, LLC. The plant utilizes a single generator comprised of multiple onshore wind turbines. Specifically, the turbines are Vestas V162-6.0 models, each with a rotor diameter of 162 meters and a hub height of 119 meters.
In its latest year of operation, the White Rock East Wind Project generated 682,951 MWh of electricity, achieving a capacity factor of 38.7%. The plant is interconnected to the Southwest Power Pool (SPP) balancing authority and resides within the MRO NERC region. White Rock East is the 22nd largest wind farm in Oklahoma out of 57, and ranks 273rd nationally out of 734 wind facilities.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
75.5K MWh
Latest Month
683.0K MWh
Annual Generation
38.7%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2023
$1,468/kW
Est. Construction Cost
Total estimated cost: $295.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP South Hub
Node Source
OSM spatial match
Last updated 2026-04-19
View all 5 articlesNo Ask reports yet for this entity.
Ask about White Rock East Wind ProjectForward forecasts, scenario decomposition, and risk-decision tooling for this asset.
Request a demo