Search plants, projects, owners, and states
1.4 MW Batteries (1 MW) + Solar Photovoltaic (1 MW) operating in Burt, NE
1.4 MW
Nameplate Capacity
2
Generators
units
Hybrid (2)
Technology
Batteries + Solar Photovoltaic
2021
Operating Since
Coordinates
41.8640, -96.2328
County
Burt, NE
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | BCSB, LLC | — | — |
| Owner(s) | BCSB, LLC | — | — |
| Status | Operating | — | — |
Burt County Solar Hybrid is a 1.4 MW hybrid power plant located in Burt County, Nebraska. The facility, owned and operated by BCSB, LLC, commenced operations in 2021. It utilizes both solar photovoltaic technology and battery energy storage. The plant consists of two generators and has a 3 MWh battery energy storage system (BESS) with a duration of 4.29 hours, employing lithium-ion battery chemistry. The solar component uses single-axis tracking.
The plant's primary fuel is listed as MWH. In its most recent year of operation, Burt County Solar Hybrid generated 1,546 MWh of electricity, achieving a capacity factor of 12.6%. The plant operates within the Southwest Power Pool (SPP) balancing authority and the Midwest Reliability Organization (MRO) NERC region. It is ranked as the 4th largest of 5 solar plants in Nebraska and 1175th largest of 1205 nationally. There has been one news article about the plant, categorized as a hazard.
Generated from EIA, GEM, and public data sources
ISO/RTO
SPP
Market
ISO/RTO Member
NERC Region
MRO — Midwest Reliability Organization
Balancing Authority
Southwest Power Pool (SWPP)
Grid Voltage
12.47 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
Historic generation and capacity factor for this asset — the foundation for forward forecasts on the InfraSure platform.
52 MWh
Net Discharge
1.5K MWh
Annual Net Energy
12.6%
Capacity Factor
Positive values indicate net discharge (generation exceeds station load). Negative values indicate net charging. Pure battery storage plants are typically net negative due to round-trip efficiency losses.
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2021
$1,770/kW
Est. Construction Cost
Total estimated cost: $2.5M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Tekamah · 161 kV
Substation Distance
< 10 km
Operator
Nebraska Public Power District
Coord Source
OSM spatial
Market Position
ISO/RTO Market
SPP
LMP Node
—
Pricing Hub
SPP North Hub
Node Source
OSM spatial match
Substation identified. Node ID not yet resolved against ISO roster.
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.
Forward forecasts, scenario decomposition, and risk-decision tooling for this asset.