Search plants, projects, owners, and states
302.4 MW Wind operating in Mills, TX
302.4 MW
Nameplate Capacity
1
Generators
unit
Onshore Wind Turbine
Technology
2022
Operating Since
Coordinates
31.5654, -98.4904
County
Mills, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
Request a demo →| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | Engie North America | Engie North America | — |
| Owner(s) | Engie North America | ENGIE | — |
| Status | Operating | operating | — |
The Priddy Wind Project is a 302.4 MW wind farm located in Mills County, Texas. The facility began operating in 2022 and is owned by ENGIE, a French multinational utility. Engie North America is the listed operator per EIA data. The plant utilizes a single generator consisting of multiple onshore wind turbines. Specifically, the turbines are manufactured by Nordex, model N149/4.8, with a rotor diameter of 149 meters and a hub height of 108 meters.
In its most recent year of operation, the Priddy Wind Project generated 1,014,915 MWh of electricity, achieving a capacity factor of 38.3%. The plant operates within the Electric Reliability Council of Texas (ERCOT) balancing authority, and the NERC region of TRE. The Priddy Wind Project ranks as the 22nd largest wind farm in Texas out of 200, and 78th nationally out of 734.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
345.0 kV
Regulatory Status
NR — Non-Regulated
Entity Type
Independent Power Producer
Sector
IPP Non-CHP
103.6K MWh
Latest Month
1.0M MWh
Annual Generation
38.3%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
Request a demo →2022
$1,395/kW
Est. Construction Cost
Total estimated cost: $421.8M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Request a demo →Market Position
ISO/RTO Market
ERCOT
LMP Node
PRID_RN
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No news articles linked yet for this plant.
News enrichment runs on demand — we have the pipeline, we just haven't fetched coverage for this plant yet. Request a detailed re-run and we'll add it.