41.8 MW Hydro operating in Bosque, TX
41.8 MW
Nameplate Capacity
2
Generators
units
Conventional Hydroelectric
Technology
1953
Operating Since
Coordinates
31.8694, -97.3667
County
Bosque, TX
Nearby Plants
Forward-looking, asset-specific exposure analytics combining climate hazards, generation variability, and counterparty risk into a single decision-grade view. Powered by InfraRisk.
See the full risk decomposition + scenarios for this asset.
| Field | EIA | GEM | Wikidata |
|---|---|---|---|
| Operator | USACE-Fort Worth District | — | — |
| Owner(s) | USACE-Fort Worth District | — | — |
| Status | Operating | — | — |
The Whitney hydroelectric plant, located in Bosque County, Texas, has a total capacity of 41.8 MW. Operated by the USACE-Fort Worth District, the plant began operations in 1953 and utilizes conventional hydroelectric technology. It consists of two generators and its primary fuel source is water (WAT). The plant operates within the Electric Reliability Council of Texas, Inc. (ERCOT) balancing authority and the TRE NERC region.
In the most recent year with available data, the Whitney plant generated 69,490 MWh of electricity, achieving a capacity factor of 19.1%. Among hydroelectric plants in Texas, Whitney ranks 8th out of 24 facilities. Nationally, it holds a rank of 342 out of 1464 hydroelectric plants.
Generated from EIA, GEM, and public data sources
ISO/RTO
ERCOT
Market
ISO/RTO Member
NERC Region
TRE — Texas Reliability Entity
Balancing Authority
Electric Reliability Council of Texas, Inc. (ERCO)
Grid Voltage
69.0 kV
Regulatory Status
RE — Regulated
Entity Type
Federal
Sector
Electric Utility
Monthly net generation as reported to EIA-923 — useful for historical context. Confidence varies sharply by fuel type; the band above and the “About this data” button explain the caveats specific to this plant and how InfraSure’s in-house model handles them.
915 MWh
Latest Month
69.5K MWh
Annual Generation
19.1%
Capacity Factor
Forward-looking generation outlook with probabilistic ranges across weather, demand, and policy scenarios. Powered by InfraSure's generation modeling stack.
See the full forecast + scenario decomposition for this asset.
2013
$2,294/kW
Est. Construction Cost
Total estimated cost: $95.9M
Forward revenue, DSCR bands, and refinancing risk projected under price, demand, and policy scenarios. Powered by InfraSure's asset cashflow stack.
See the full revenue + DSCR projection for this asset.
Point of Interconnection
Nearest Substation
Whitney Dam Substation · 69 kV
Substation Distance
0 km
Operator
Brazos Electric
Coord Source
OSM spatial
Market Position
ISO/RTO Market
ERCOT
LMP Node
WND_WHITNEY
Pricing Hub
HB_NORTH
Alt. Hub / Zone
LZ_NORTH
Location Type
Resource Node
Node Source
Curated node match
No wholesale contracts disclosed in FERC EQR for this plant.
FERC EQR captures bilateral wholesale energy + capacity contracts ≥$1M/yr filed quarterly by jurisdictional sellers — covers renewable PPAs, thermal energy sales agreements, capacity contracts, and tolling agreements alike. Many plants don't appear: regulated-utility output flows to ratepayers via cost-of-service rather than bilateral contracts; small projects fall below the filing threshold; tax-equity-financed renewables route offtake to investors not utilities; merchant plants sell into ISO clearing markets without bilateral contracts. News-extracted buyer facts (below) may surface contracts disclosed only through announcements.
Last updated 2026-03-26
View all articlesNo Ask reports yet for this entity.
Ask about WhitneyForward forecasts, scenario decomposition, and risk-decision tooling for this asset.